Gravitate Media Support March 31, 2011 • Announcements
We will be conducting some failover tests on an interconnect between two
datacentres during this maintenance window.
The design of this interconnect is a fault-tolerant ring - the purpose of the test is to ensure traffic can flow
the other way round the ring in the event of an outage to the primary path.